Project Overview Catify delivered a complex survey package at Heathrow Terminal 4’s MSCP4 scheme, working across multiple operational levels over a five-month programme. The project was undertaken to support the redesign of the terminal infrastructure and required highly accurate survey control alongside extensive utility and asset capture. …
NGED Diversions – Multi-Scheme Feasibility for Strategic Network Upgrades
Project Overview Catify is currently supporting the National Grid Electricity Distribution Diversions. The commission covers a single programme made up of nine schemes across Derbyshire and Lincolnshire and includes both overhead transmission and underground cable feasibility inputs. Scope of Services Route…
Heathrow Car Parks – Landside Surveys for Safety and Access Improvements
Project Overview Heathrow Car Parks – Landside Surveys for Safety and Access Improvements Scope of Services Underground Utility Detection Topographical Survey Ultra-Wideband Ground Penetrating Radar (UWB-GPR) Project Approach The site works were programmed in stages following several weeks of planning, permit submissions and stakeholder…
Golden Hill to Milford Haven – Feasibility Study for a New HV Cable Route
Project Overview Catify was commissioned to support National Grid Electricity Distribution on the Golden Hill to Milford Haven feasibility study, a major project exploring a new high-voltage cable route in West Wales. The commission required a broad, multidisciplinary feasibility process designed to assess technical, environmental and logistical constraints…
Hackney C 6.6kV – LOD2 Utilities Survey Using Mobile Mapping Data
Project Overview Catify delivered a challenging, high-value LOD2 underground utility detection commission on behalf of UK Power Networks for the Hackney C 6.6kV project. A key feature of the scheme was the use of NavVis mobile mapping point cloud data to…
A66 West Phase 2 – Corridor Surveys for Major Road Redevelopment
Project Overview Following successful delivery during Phase 1, Catify was appointed to undertake Phase 2 survey works on the Balfour Beatty A66 West redevelopment programme. The project involved gathering utilities, topographical and carriageway condition information across a remote section of the…
Coppermill Lane – Multi-Disciplinary Surveys for Substation Enabling Works
Project Overview Catify supported UK Power Networks on enabling works for a new incoming substation as part of the Coppermill Water Supply Resilience Programme. The site was technically complex, with survey areas spanning an operational Thames Water compound, a public recreation ground and water-based locations requiring specialist…